Alessandro Median from Indian Street to Perris Boulevard

Construction is complete for this project. The median has been installed with decorative concrete adjacent to the left turn lane. Non irrigated drought tolerant landscaping has also been installed. The traffic signal at Alessandro Boulevard and Perris Boulevard has been modified so that dual left turn lanes have been provided in the eastbound and westbound directions. A traffic signal was installed at the intersection of Alessandro Boulevard and Covey Quail Lane (located approximately half way between Indian Street and Perris Boulevard). Curb ramps at the two traffic signal locations have been improved to be in compliance with ADA requirements. The pavement has been milled and overlaid with a rubber asphalt mix to improve the riding surface and associated signing and striping has been installed. The total cost of the project is $1,460,000.